Bollard pull test procedure pdf files

Bollard pull tests sometimes are performed after major engine overhauls. Select the right location of where the bollard will be located 2. Propeller design optimization for tunnel bow thrusters in. The bollardscan tm is a unique way to establish the reliability of the bollard and its foundation. What links here related changes upload file special pages permanent link. They are a simple and costeffective way to fulfill mooring requirements and safely secure vessels alongside jetties, berths, wharves and dolphins in ports and harbors. Barrel loading when figureofeight belayed assumed to.

They are extremely darable c oating using electrostatic process. Bollard load testing bollard load testing the true global. The smartest bollard test the bollardscan tm is a unique way to establish the reliability of the bollard and its foundation. Ships requiring high bollard pull can be fitted with a nozzle, which increases thrust by up to 2040% compared to open propellers. International standard for bollard pull trials page 4 31 1 definitions 1. Pdf use of cfd simulations is an affordable and trustworthy way of determining a. Bollard pull testing becoming standard for newly classed. The adequacy or precision of the various bp test procedures may of course be discussed, see e. It rigorously calculates all the forces on the vessel, viz. A drop in dnvgl witnessed load cell measures the load placed upon a bollard under test.

Bollard pull overview international marine consultancy. The term bollard pull is used as a term referring to the total amount of thrust that a boat or ship can generate and sustain during a test for which the vessel is secured to a. Rules in these general conditions means the documents below issued by the. Recommended swl, load position, safety factor and test load fitting swl load position line position safety factor on yield test load notes double bollards per iso 39 single rope maximum loading 1. Bollard pull a hydrocomp technical report report 110 overview bollard pull is a term often used to describe the pulling capability of towing vessels. This breakthrough replaces the traditional method of a tug pulling against the bollard, a method that has previously caused damage to vessels and. Practical bollard pull tests under simplified conditions are conducted for. The term bollard pull is used as a term referring to the total amount of thrust that a boat or ship can generate and sustain during a test for which the vessel is secured to a mooring bollard via a hawser with a load cell.

R ule c ha nge n o t i c e 2014 rule change notice 2014 the effective date of each technical change since 1993 is shown in parenthesis at the end of the subsectionparagraph titles within the text of each part. Maximum bollard pull is achieved with the cable right astern, rudders amidships and a further reduction in bollard pull must be allowed for should the angle of the cable lead other than right astern. Welcome to the bollard pull calculator for barges rev 02 what does this excel sheet do. Excel sheet for required bollard pull calculation boat. They are extremely darable c oating using electrostatic process cbm1105c315w4k. This note deals with bollard pull test and the certification of this test. This is contained in the sheet named bollard pull dnv. Sustained bollard pull is the mean val ue of the pull during a 5 minutes test. Bollard pull overview international marine consultancy bvba.

Propulsionbollard pull test, recommended procedures and guidelines. Bollard pull test procedure ships telemetry scribd. Bollard pull test procedure free download as word doc. To construct and use a bollard test device, a motor is mounted to the bottom of a fulcrum device, often a. The actual bollard pull trail is carried as follows. Hold the bollard in place and using a hammer drill, drill one 120mm deep hole into the ground 3. Tow speed and bollard pull analysis project example. Theoretical and experimental measurements of bollard pull with emphasis on. Request pdf various aspects of bollard pull tests and analysis of test results.

This figure is not accurately determinable by mathematical methods, therefore it must be evaluated for each tug by a bollard pull test. Pdf study on the procedure to obtain an attainable speed. Required bollard pull for a harbour tug boat design net. Bollard pull calculations excel sheets and software hi i can see there is a dying need for some authentic source for bollard pull calculations.

Pdf reenactment of a bollard pull test for a double propeller. Rules for the certification of the bollard pull of tugs tasneef maritime. P the bollard pull that is the documented maximum continuous pull obtained from a static pull test on sea trial, carried out in accordance with annex a of msccirc. Rating is available when the video has been rented. Bollard pull load test ultrasonic flow rate measurement. However, the term bollard pull has developed three different meanings, and it is important to know which intended meaning is being used.

Marin performs, analyses and reports bollard pull trials according to this standard which is set up in collaboration with several class societies abs, bv, lr. The propulsion test procedure addresses model scale only and does not consider ex trapolation and full scale prediction. It is defined as the force in tons or kilonewtons kn exerted by a vessel under full power, on a shoremounted bollard through a towline, commonly measured in a practical test but sometimes simulated under test conditions that include calm water, no tide, level trim, and sufficient depth and side. Bollard pull is a conventional measure of the pulling or towing power of a watercraft. Bollard load testing bollard load testing the true. Department marine engineering, faculty of maritime studies, king abdulaziz university, jeddah saudi arabia. Propeller design optimization for tunnel bow thrusters in the. By request, this is a spreadsheet program that calculates bollard pull for rc tugboats. Built upon its innovative, patented and proven technology, blt provides forwardlooking ports, harbour boards and terminal operators with total confidence in the rated performance of their mooring bollards and surrounding structures. I have developed excel templates and a software for calculations using industry accepted rules, like dnv, nobledenton, opl, bv and kr rules, and am in the process of testing it. The bollard pull of a tug is the force it exerts at zero forward speed, in calm water conditions, with the engine working at its full power 100% mcr. What is bollard pull test and requirements for the bollard pull test bollard pull is the static force exerted by a ship on a fixed tow line at zero speed. Trawl pull is a force exerted by a ship on a tow line at speed in another words bollard pull is the maximum pulling capacity of a tug that can exert. Installation instructions bollards into concrete surfaces.

Maximum static bollard pull is the highest 30 second value read during the test. Hull model making module, geometrical file, hull data. An important aspect regarding the bollard pull of highly loaded ducted propellers is the cavitation. Zahalka, association of hanseatic marine underwriters bollard pull is, the tractive force of a tug, expressed in metric tonnes t or kn. Theoretical and experimental measurements of bollard pull. Ensuring sufficient bollard pull and tug power to complete the operation. Bollard pull test is carried out by steaming into a towrope which is fixed ashore and connected to a measuring device, successively with three different performance. Mechanical testing for welder and procedure qualification test sample. International standard for bollard pull trials v1 2019. Run it on a portable computer that you bring to the pond free. Jul 15, 20 by request, this is a spreadsheet program that calculates bollard pull for rc tugboats. Sustained bollard pull is the mean value of the pull during a specific time period 5 to 10 min.

This excel sheet calculates the required bollard pull to tow a conventional ship shaped vessel. Oem blt operates worldwide delivering its exemplary bollard load testing service, to us military standard. These rules describes the procedures, the trial site. This excel sheet helps you calculate the required bollard pull of a tug used for towing a barge how is the excel sheet organised. Summarizing the below requirements, practical bollard pull trials need to be. Tug owners whose tugs have been tested usually provide a copyof the certificate attesting to the bollard pull figure. Recommended swl, load position, safety factor and test load. A spreadsheet to calculate the required bollard pull to tow a barge. Bollard pull testing becoming standard for newly classed tugs. Bollard pull is the most commonly used measure of shipassist tugs performance which have propellers optimized for maximum thrust at close to zero speed. Specifically, a bollard test measures the thrust of.

During the sea trials the vessel performance in terms of manoeuvrability, ship speed and also bollard pull is measured by means of specialised equipment see. Detailed information is available in the anchor handling manual. Based on wind height and shape coefficients from abs modu rules, and corrected for wind direction. Prior to actual testing the shipyardowner should provide the following information.

For best results we suggest the bollard is placed on a flat. Bollard pull, like horsepower, is a selling point for tugs and is sometimes overstated. Finally illustrating how the vessel towing force and bollard pull are measured and the requirement necessary for such tests. The first method is based on dnv rules for marine operations. Minimum required static bollard pull of the tugs will be calculated as follows. The purpose of the procedure is to ensure consistency of methodology and the acquisition of correct results for the propulsion test and its special cases bollard pull and trawl pull test bollard pull is the static force exerted by a ship on a fixed towline at zero speed. All cyclone bollards are manufactured with an extrusion base and a cast aluminum head module,therefore are adjustable in height to suit any application. Environmental conditions wind speed, current, trial procedures. It is calculated using the established holtrop and mennen formula. The excel sheet provides four different methods for calculations. Whats really driving the increase in bollard pull testing is the spread of shoreside and offshore liquefied natural gas lng facilities.

Pdf the cost evaluation for voyage route planning in an icecovered sea is one of the major topics among ship owners. Pdf study on the procedure to obtain an attainable speed in. Documentation of bollard pull documentation of all towing vessel equipment, ref. Various aspects of bollard pull tests and analysis of test results. Excel spreadsheet for bollard pull calculations barge. What is bollard pull test and requirements for the bollard.

International standard for bollard pull trials 2019 pdf marin. The bollard test can be done in a test tank of any size, but very small containers may set up a circular flow which can give an inaccurate force reading. If the readings are recorded at 30 seconds intervals, sustained bollard pull is the mean value of these readings during a 5 minutes test. Three remote cameras record the entire bollard load testing procedure, whilst lasers are targeted at the bollard to detect any microscopic movement. To view a demonstration of the bollard load test scale model, click the video on the right. This can help in selection of an appropriate tug for a tow. And whether it still meets the design requirements of the structure. Trawl pull is a force exerted by a ship on a towline at speed. A comprehensive bollard test will look at a number of different propellers. R ule c ha nge n o t i c e 2014 rule change notice 2014 the effective date of each technical change since 1993 is shown in parenthesis at the end of the. We would like to show you a description here but the site wont allow us. Tow speed and bollard pull analysis project example project. Welcome to the bollard pull calculator for barges rev 02. Bollard pull testing also provides a way of avoiding confusion, uncertainty and even exaggeration about the actual horsepower rating of a tugs engines.

With the ever increasing size of vessels, the time has come to focus and raise the issues that have been experienced with bollard failure, as well as the challenges faced in testing the swl of bollards. There is no reason to start another topic to discuss static pull tests because that is the generic name for a bollard pull test. It provides options for calculations using three methods. The testing procedure in appendix a or a similar procedure should be adhered to. Marine bollards come in a range of design profiles, sizes and mooring line capacities to suit all mooring operations. This study focuses in simulating a bollard pull of a specific tugboat and. In case of the bollard pull test, a certified load cell is to be used. The dnv bp test procedure is therein considered to be one of the better ones. Tugs and tows a practical safety and operations guide the. Bollard pull test trial site and vessel requirements. Bollard pull joint industry project partners, marin.

The tug against tug method must be specially considered. Gives 4 different methods to calculate the required bollard pull. The methodology that was developed inhouse is based on the transmission of vibration and sound through the structure allowing us to pinpoint any errors. Insitu carbonation test insitu tensile pullout and shear tests on structural fixtures, lifting beamshooks. The second method is using industry standard opl guidelines for barge. Hold the bolt, hammer into the ground and tighten with a 18mm socket.

23 387 1013 202 355 598 1328 555 1131 1488 1427 476 577 1154 817 1047 490 1004 1255 67 691 162 1299 1495 147 825 383 295 1453 1345 49 872 217 516 1058 175 897